Płaszów II Wastewater Treatment Works

  • Increased treatment capacity from 132 to 656 thousand cubic metres per day.
  • Construction of a secondary (biological) works.
  • New sludge treatment centre including sludge incineration and energy recovery by heat generation from biogas.

The modernisation and extension of the Płaszów II wastewater treatment plant created one of the most technologically advanced and efficient treatment works in Central and Eastern Europe.

Arup managed the project, which resulted in a fully-automated plant with advanced monitoring, instrumentation and control systems.

The construction of secondary treatment works means that the plant can meet strict new EU and Polish directives on the removal of nitrogen and phosphorus, which can choke rivers with algae.

Biogas for electricity

A new treatment centre uses a patented method to disintegrate the sludge, helping to dewater it and increasing biogas production by 20%. The biogas will be used to produce electricity.

The dry sludge is to be burned in a new incinerator plant, which is currently under construction and also managed by Arup’s team. Capable of processing 23,400t of dry solid every day, the incinerator is 10% bigger than average plants.

With modernisation complete, 18ha of old lagoons, previously used for drying the sludge, could be reclaimed. The project will also contribute to gradual restoration of water purity in the River Vistula and consequently, the Baltic Sea. The Płaszów II plant will serve Krakow for the next 40 years.

Share:

  • Plaszow Water Treatment Works, from the air. Credit MPWiK SA.Open gallery

    The plant meets strict new EU and Polish directives on the removal of nitrogen and phosphorus.